Mission Statement
Instruments
Solar Optical Telescope
X-Ray Telescope
EUV Imaging Spectrometer
Operation
This Week
Latest Images
Observation Proposals
Coordinated Observations
Eclipse Seasons
Science Working Group
Science
Hinode Science Center
Quick Look Movies
Data Archive
Analysis Guide
Instruction for Users
Enquiry
Meetings
Publications
SOLAR-C Project
Information
News
Messages
Members
Contacts
Miscellaneous
Gallery
Free Stuff
Internal Page
Links
Hinode
(Solar-B) Launch
2006
Nov 27-Dec 03 -
Observation summary
Nov 20-24 -
Tracking the active region
Nov 10 -
Switch to east limb
Nov 07 -
Trailing the sunspot
Nov 02 -
Unbelievable Data
Nov 01 -
SOT image stabilized
Oct 31 -
Image stabilizing performance
Oct 30 -
Data evaluation in progress
Oct 28 -
EIS got spectra
Oct 27 -
EIS front door opening
Oct 26 -
Tremendous data continues to flow
Oct 25 -
SOT captured its first image
Oct 24 -
XRT visible light image
Oct 23 -
XRT first X-ray image
Oct 21 -
EIS CCD camera test
Oct 20 -
Camera bake out completed
Oct 19 -
CCD camera test
Oct 18 -
Tests in progress
Oct 17 -
SOT CCD cameras on
Oct 16 -
EIS power on
Oct 15 -
Holiday
Oct 14 -
SOT side door open
Oct 12 -
Attitude control verified
Oct 11 -
Safe hold test
Oct 10 -
Attitude control test
Oct 09 -
Biased Momentum
Oct 07-08 -
Relocation of operation center
Oct 05-06 -
The operation team is moving from USC to SSOC
Oct 04 -
The on-board processor of CTM power on
Oct 03 -
Sun-synchronous orbit
Oct 02 -
The first power on
Oct 01 -
Orbit maneuver
Sep 30 -
Fine tuning
Sep 29 -
A day off
Sep 28 -
Momentum wheel
Sep 27 -
Spacecraft orbit maneuver
Sep 26 -
Preparation for orbit maneuver
Sep 24 -
Verification of spacecraft attitude
Sep 23 -
Everything is perfect!
Sep 22 -
We are GO for the launch
Sep 19-20 -
Solar-B ready to fly
Sep 18 -
Launcher test
Sep 17 -
Holiday
Sep 16 -
Launcher test
Sep 15 -
Functional test
Sep 14 -
Launcher cable connection
Sep 13 -
Transportation
Sep 12 -
Preparation for transportation
Sep 11 -
Functional test
Sep 10 -
Nose fairing installation
Sep 9 -
Nose fairing installation
Sep 8 -
Preparation for nose fairing installation
Sep 7 -
System test
Sep 6 -
System verification
Sep 5 -
Preparation for system test
Sep 4 -
Ignition system
Sep 3 -
Holiday
Sep 2 -
Spacecraft installation
Sep 1 -
Preparation for installation
Aug 31 -
Clean up
Aug 30 -
Preparation for rocket installation
Aug 29 -
Clean up
Aug 28 -
RCS pressurization
Aug 27 -
RCS Hydrazine filling
Aug 26 -
RCS filling preparation
Aug 25 -
Moved to clean booth
Aug 24 -
Press release
Aug 23 -
Battery recondition
Aug 22 -
Battery recondition
Aug 21 -
Battery recondition
Aug 20 -
Thunder
Aug 19 -
Battery recondition
Aug 18 -
RF test
Aug 17 -
Holiday
Aug 16 -
Clean up
Aug 15 -
Thruster Pressure Test
Aug 14 -
Thruster Pressure Test
Aug 13 -
Thruster Installation
Aug 12 -
Thruster Test
Aug 11 -
Antenna and MLI
Aug 10 -
Wire tension and RCS test
Aug 09 -
Telemetry and attitude system test
Aug 08 -
Pre-launch short functional test
Aug 07 -
Holiday
Aug 06 -
Launch operation rehearsal
Aug 05 -
Overall test of the nominal
Aug 04 -
Overall test of the backup
Aug 03 -
Ready for functional test
Aug 02 -
Visual inspection
Aug 01 -
Arrived at the launch site
Jul 27 -
Heading for the launch site